References of our company

OBO products in use.

Leipzig Airport

OBO Projekt- und Systemtechnik GmbH completed project in record time

Where were OBO products installed?

Location: Bundesrepublik Deutschland, Leipzig
Customer: Leipzig Airport
Installation engineer: OBO Projekt- und Systemtechnik GmbH
Length of construction: 21 months
Installed OBO product units: Cable support systems, Fire protection systems

Project description

It is considered the most modern transport hub in central Germany: over the last twelve months, Leipzig/Halle Airport has consistently adapted its infrastructure to growing passenger numbers. The connection of the airport's station to the long-distance network of German Railways means that an additional level of expansion has been completed. The central terminal not only offers passengers a comfortable arrival, but also direct access to the check-in area on the second level.

What type of challenges occurred during construction?

OBO Projekt- und Systemtechnik was charged with the expansion of the shopping mall and check-in areas of the terminal. Within a very short time, huge quantities of installation material had to be made available and mounted. RKS and MKS cable trays with different versions and dimensions were used. In addition, cable ladder with all the appropriate mounting systems and systems to maintain electrical supply were installed. The construction project was completed successfully in a record time of just 21 months.